Bring us the problem nobody else could solve
Lead-lined hospital walls, competing RF, a failed acceptance test two weeks before occupancy, a design that does not pencil. We question everything and we like the hard ones.
- You talk to an engineer, not a qualifying script
- Manufacturers ask us how to make their own products perform
- If we are not the right call we will tell you who is
DIRECT LINE: 303-647-6943
A LINX engineer reads every request and replies personally.
HOW IT WORKS
What happens when you send this
As much or as little detail as you have. A photo of the problem is often enough.
An engineer, not a rep, decides who calls you and what to bring to the call.
Twenty minutes on your situation. You get a straight opinion on the call itself.
Next step is a test, a quote, or nothing. We will say so either way.
EVERY SCOPE, ONE CONTRACT
Design, install, test and support, all under one contract.
One point of contact for design, installation and long-term support, instead of handing your property between four companies.
Engineers evaluate the property and design a system that maximizes coverage and minimizes cost.
Our crews deploy, commission and manage the project start to finish.
We heat-map the property, identify deficient areas per carrier and document the results.
We help you choose the right solution, with design concepts and budgetary guides.
CODE & COMPLIANCE
Your approvals depend on this system passing.
Many state and local codes require a public safety ERRCS, and requirements differ from one jurisdiction to the next. We design to the code your AHJ actually enforces, handle the paperwork, and test the finished system so you have a report to hand them.
- Designed to your AHJ’s adopted code edition, not a generic national reading
- Permit drawings, submittals and stamped documentation handled for you
- We run the test and give you a report to submit to your AHJ
- Annual inspection and monitoring requirements documented up front
CERTIFICATIONS & APPROVALS
WHERE WE WORK
Work completed in all 50 states, offices where the work is.
Regional teams mean a site visit is a drive, not a flight. Tell us the address and we'll tell you who covers it.
QUESTIONS WE GET
Is an ERRCS actually required for my property?
Many jurisdictions now require a public safety radio system as a condition of occupancy or final sign-off. Whether it applies to your property, what triggers it, and how strictly it is enforced all vary by AHJ, which is why we design to your local code rather than a national assumption.
What is the difference between an ERRCS and a cellular DAS?
An ERRCS carries first responder radio traffic and is code-driven. A cellular DAS carries commercial carrier signal and is amenity- and operations-driven. A converged system uses the same cabling and antennas for both, which is usually the cheapest way to end up with both.
Do you use subcontractors?
Design, installation, testing and consulting are self-performed by our own teams. That is why schedule commitments hold, and why there is one company to call when something needs attention.
How long does an installation take?
It depends on size and construction, but the design and permitting path is usually the long pole, not the install. We give you a real sequence of work with the quote so you can plan against it.
We failed our acceptance test. Can you help?
Yes, and it is a common call. We test independently, identify why it failed against the code threshold, and give you the shortest path to passing rather than a proposal to start over.
Do not assume it cannot be fixed
We have not met the property yet that could not be solved.
Have an expert call me